Announcement:

A portion of Cocke Drive, between the MH and BB, will be closed June, 27, 20 ... (Read More)
Request Service

All Announcements

UC: Installation of LED Lighting

Work to install LED lighting on the wood trellis located in the University Center (UC) courtyard is scheduled from March 13, 2017 through March 17, 2017, as part of the project to improve lighting levels and enhance the appearance of the courtyard.  The work area will be cordoned off by barricades and safety tape to accommodate foot traffic to food and other venues including Starbucks and the Technology store.  For additional information, please contact the Facilities Service Center at 458-4262.


BSE: Air-handler #86 Shut-down for Repairs

Air-handler unit #86 that services the south-side of the Biotechnology Sciences & Engineering (BSE) building, rooms 2.230 through 2.214, 3.252 through 3.232 and all in corridor 4.200, will be shut-down on March 15, 2017 from 8:00 a.m. until 3:00 p.m. for repairs to the motor skid.  The shut-down will affect doors (hard to open), air-conditioning and ventilation to these areas of the building.  All other units in the building will remain operational.  The unit will be turned back on immediately following completion of work at 3:00 p.m. on March 15th.  For additional information, please contact the Facilities Service Center at 458-4262.


MB: Renovation of COEHD Computer Lab to Start March 6th

Renovation work in the MB, ground level room 0.330, is scheduled to begin on March 6, 2017 with anticipated completion by May 31, 2017 as part of the College of Education and Human Development computer lab project.   Work will be performed in two phases to allow the lab to remain open throughout the project.  For additional information, please contact the Facilities Service Center at 458-4262.


BSB: Air-handler Shut-down for Repairs

Air-handler unit 75B that services the first floor of the BSB will be shut-down on Monday, February 27, 2017 from 8:00 a.m. until 5:00 p.m. for repairs (duct).  During this time there will be limited heating available to this area of the building.  Air-handler 75A will remain operational and will supply the area with ventilation and cooling services.   For additional information, please contact the Facilities Service Center at 458-4262.


BSE: Water Softener System Down for Emergency Repairs

Repairs to the water softener system that services the BSE are complete and the system has been turned back on. For additional information contact the Facilities Service Center at 458-4262.


Greenhouse: Portion of Roof to be Replaced Starting Feb 20th

Weather permitting, the west campus Greenhouse roof replacement project will begin on February 20, 2017 at 7:00 a.m. with anticipated completion by February 23, 2017 at 6:00 p.m.  Work, including delivery of materials and intermittent two hour daily road closures, may cause travel delays in and around the project site.  For additional information, please reference the attached drawing or contact the Facilities Service Center at 458-4262.

Greenhouse Project Map

 

 


BSE: Preventive Maintenance of Air-handler Units

The air-handler units that provide conditioned air to all floors (exception of Vivarium – not affected) of the Biotechnology Sciences and Engineering (BSE) building will be shut-down one at a time between 5:00 a.m. and 8:00 a.m. from February 13, 2017 until February 16, 2017 for preventive maintenance.  No other utilities will be affected by the shut-downs; however, exhaust to fume hoods may be at a minimum during maintenance (keep sashes closed).  For additional information, please contact the Facilities Service Center at 458-4262.


AET/BSE: Chilled Water System Shut-down for Repairs

The chilled water system that services the AET and the BSE will be shut-down today, February 3, 2017 from 6:00 a.m. until approximately 5:00 p.m. for emergency repairs. During this time there will be no chilled water available to these buildings. The chilled water system will be turned back on immediately following completion of emergency repairs or by no later than 5:00 p.m. on Feb 3rd. For additional information contact the Facilities Service Center at 458-4262.


SAL: Roof Replacement Project

Work to replace the roof on the Small Animal Lab (SAL) is scheduled to begin on February 12, 2017 with expected completion by April 17, 2017.   Occupants, students and visitors of the SAL, Science Research Labs (SRL) and the Central Receiving and Warehouse (CRW) may be impacted by staging of materials (laydown area on attached drawing) and construction traffic/barricades.  For additional information, please reference the attached drawing or contact the Facilities Service Center at 458-4262.

SAL Roof Replacement Map

 


MBT: Vacuum System Repairs

Work to repair the vacuum system located in the Margaret Batts Tobin (MBT) building is scheduled for Monday, February 13, 2017 from 7:30 a.m. until 4:30 p.m.   During this time, the building vacuum system will not be available for use throughout the building.  The system will be turned back on immediately following completion of repairs at 4:30 p.m. on Feb 13th.  For additional information contact the Facilities Service Center at 458-4262.


AET: Shut-down of Heating Hot Water for Emergency Repairs

Hot water used to heat the AET building will be shut-down immediately, beginning on February 1, 2017, to identify the source of a leaking water line and make repairs.  During this time, occupants may experience a slight decrease in room temperature by a couple of degrees.  Heating hot water will be restored as soon as possible.  We will send an update notice when more information is available.  For additional information, please contact the Facilities Service Center at 458-4262.