Request Service

All Announcements

San Antonio Exits Drought Restrictions

Update 10/12/18:  San Antonio Exits Drought Restrictions.  Per city ordinance, San Antonio City Manager and SAWS President/CEO declared the end to Stage 1 and 2 drought restrictions effective Tuesday, October 2, 2018.

The City of San Antonio is now in Stage I Drought Restrictions according to the San Antonio Water System (SAWS).  Stage 1 of the city’s drought plan goes in effect when the 10-day average of the Edwards Aquifer at the J-17 monitoring well drops to 660 feet or below.

In support of water conservation and environmental stewardship, UTSA campuses will water only on Mondays before 11 a.m. or after 7 p.m.  Campuses will be restricted from washing impervious covers, such as parking lots, driveways, streets, buildings and sidewalks and operating the sprinkler and irrigation systems on weekends.  Athletic and sports fields are considered special use areas and additional watering day variances may be requested and granted from SAWS.  A SAWS variance will also be required to operate outdoor commercial fountains during drought stages 1 – 4.  For additional information on UTSA’s compliance with the drought restrictions, contact the Facilities Service Center at 458-4262.  For more on SAW’s announcement or for a schedule of watering days and additional information on Stage 1 restrictions please visit:  http://www.saws.org/latest_news/NewsDrill.cfm?news_id=3459 and http://www.saws.org/conservation/droughtrestrictions/StageOne.cfm.


Portion of BK5 Parking Lot Closed Oct 15 – 29

Update 10/24/18:  Due to weather conditions, this portion of the BK5 parking lot will remain closed through Monday, October 29, 2018.

A portion of the BK5 parking lot located near the Child Development Center (CDC) will be closed from Monday, October 15, 2018 until Monday, October 22, 2018, for repairs to the water line that services the CDC.  Detour signs will be posted in and around the work area to assist with vehicular and pedestrian traffic.  For additional information, reference the attached photos or contact the Facilities Service Center at 458-4262.

BK5 Closure Oct 15


NPB – 4th and 5th Floor Men and Women’s Restrooms Closed for Emergency Repairs October 10

The men and women’s restrooms on the fourth and fifth floors of the NPB are currently shut down for emergency repairs.  Alternate restrooms are located on the first, second and third floors. A follow up email will be sent once repairs have been completed.  For additional information, contact the Facilities Service Center at 458-4262. 

 


FLN Exhaust Fans – Maintenance Scheduled for October 13 and 14

Exhaust Fans #5, 6, 9N, 9S, 14, 15, 16, 21, 23E, 30, 34N, 34S, 39, 40, 10, 100, 101, 102, 103 and 104 that service the FLN will be shut down one at a time between 6:00 a.m. and 4:00 p.m. on Saturday, October 13, 2018 and Sunday, October 14, 2018, for required maintenance.  Work will only affect the use of fume hoods.  Please do not use or store chemicals inside fume hoods during the scheduled outages.   For additional information, contact the Facilities Service Center at 458-4262.