BSB: Exhaust Fan Replacement – September 30 – October 2, 2020

(September 29, 2020) – An exhaust fan located on the roof of the Biosciences Building (BSB) will be replaced from Wednesday, September 30, 2020 to Friday, October 2, 2020, with work to be performed daily from 8:00 a.m. to 4:00 p.m. The BSL 3 area will be without heating, ventilation, and air conditioning (HVAC) during the exhaust fan replacement. A crane will be placed on the south side of the Ximenes Avenue Garage (XAG) on Wednesday, September 28, 2020 for lift operations. Portions of the sidewalk between the BSB and XAG and a sidewalk near the Applied Engineering and Technology Building (AET) will be closed during crane operations. Building occupants, especially those on the third floor, may experience noise during this maintenance project. For additional information, please refer to the attached map or contact the Facilities Service Center at (210) 458-4262.  BSB Map