The green space common area located between the Convocation Center (CC) and the H-E-B Student Union (HSU) will be closed from November 18, 2019 through December 5, 2019, for installation of new drainage, bio-media and landscaping, as part of the City of San Antonio’s Proposition 1 Grant Paseo Principal StormWater Retrofit project. Construction fencing will be installed and detour signage posted around the work area to assist with pedestrian traffic. For additional information, reference the attached map or contact the Facilities Service Center at 458-4262.

Project Limits 2