A crane will be set up in the Ximenes Avenue Lot (XL) on Saturday, August 11, 2018, in support of the STEP project to repair a cooling tower gearbox.  The lot drive lanes south of the STEP will not be accessible to vehicular and pedestrian traffic between 7:00 a.m. and 5:00 p.m. on Aug 11.   Safety barriers and flag personnel will be posted in and around the work area to assist with traffic.  For additional information, reference the attached map or contact the Facilities Service Center at 458-4262.

STEP Crane Lift rev 2