Request Service

Lecture Hall Concrete Work at BB Rescheduled

(April 27, 2021) – Concrete work to renovate lecture halls at the Business Building (BB) has been rescheduled to Thursday, April 29 from 7 a.m. to 5 p.m.

During this time, a concrete truck will be parked near the building entrance at corridor 1.01, located on the east side of the building. Workers will use this entrance to transport concrete barrels to the 2nd floor of the Business Building.

For additional information, review the worksite map or contact the Facilities Service Center at (210) 458-4262.

(April 21, 2021) – Concrete work to renovate lecture halls at the Business Building (BB) is scheduled for Tuesday, April 27 from 7 a.m. to 5 p.m.

During this time, a concrete truck will be parked near the building entrance at corridor 1.01, located on the east side of the building. Workers will use this entrance to transport concrete barrels to the 2nd floor of the Business Building.

For additional information, review the worksite map or contact the Facilities Service Center at (210) 458-4262.