The following partial road closure has been rescheduled from Saturday, November 4, 2017 to Saturday, November 18, 2017.

Work will begin at manhole #1 and conclude at manhole #3 – reference attached drawing. 

Ximenes Avenue will be shut down to one lane, in each direction, between Ford Avenue and Brackenridge Avenue from 7:00 a.m. to 5:00 p.m. on Saturday, November 4, 2017 for work related to the new intersection at Ximenes Avenue and UTSA Boulevard.  Work includes pulling data cables from the EB to the intersection through manholes located between Ford Avenue and Brackenridge Avenue.  Flaggers will be posted at each manhole to assist with traffic in and around the work areas. For additional information reference the attached drawing or contact the Facilities Service Center at 458-4262.

Ximenes Manhole Locations REV