Request Service

Single-Use Restrooms in the BB and MS Get Makeover

(March 28, 2019) – The Facilities Construction Team (FCT) completed the renovation of the single-use restrooms, located on the first floor of the BB and MS, over spring break. The makeover included the installation of new epoxy flooring, wall tile and partition resurfacing treatments that modernized the look of the restrooms.

Epoxy resin treatments provide durable resistant surfaces that are easy to maintain and since the process includes repairing and recoloring existing surfaces there are no additional costs typically associated with traditional renovations such as demolition, material purchases and installation. The result of epoxy resurfacing treatments is a long lasting upgrade at a fraction of the cost.

Great job FCT!