(January 3, 2019) – Thanks to the hard work of the Facilities Construction Team (FCT), renovation of the west campus Business Service Annex (BSA) restrooms was completed over the winter holiday break. Low cost and highly effective epoxy based flooring, wall tile, and partition resurfacing treatments were used to transform the look of the restrooms.
Epoxy resin treatments provide durable bacterial resistant surfaces that are easy to maintain and since the process includes repairing and recoloring existing surfaces there are no additional costs typically associated with traditional renovations such as demolition, material purchases and installation. The result of epoxy resurfacing treatments is a long lasting upgrade at a fraction of the cost. Due to its success, this project will serve as a prototype for other restroom renovations throughout the University. Great job FCT!