Request Service

TxDOT Loop 1604 Lane Closures

(May 21, 2021) – The Texas Department of Transportation (TxDOT) moved forward with the Loop 1604 Expansion Project.

Stay in the loop with project updates and closure information by subscribing here.

Below is a list of scheduled lane closures.

  • Wednesday, June 2 until Friday, June 11. Weekdays 9 a.m. to 3 p.m. Single lane closure on westbound frontage road from I-10 to La Cantera Parkway for right of way preparation.
  • Wednesday, June 2 until Friday, June 11. Weekdays 9 a.m. to 3 p.m. Alternating shoulder closures on westbound frontage road from I-10 to Bandera Rd. for right of way preparation.
  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound single mainlane closure, including the entrance ramp from SH 16 and exit ramp to Hausman Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use Kyle Seal Parkway entrance ramp and the exit ramp before Bandera Rd.
  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the entrance ramp from Kyle Seale Parkway and exit ramp to Babcock Rd., for restriping and barrier setting. DETOUR: Traffic will be directed to use the entrance ramp after Babcock Rd. and the exit ramp before Hausman Rd.
  • Sunday, May 23 until Friday, June 18. Weeknights 9 p.m. to 5 a.m. Alternating eastbound mainlane closure, including the exit ramp to La Cantera Parkway/Chase Hill, for restriping and barrier setting. DETOUR: Traffic will be directed to exit before Babcock Rd.

Note, no two consecutive ramps will be closed at the same time.